MCR Engineering News

Holden Installations recently engaged MCR Engineering to supply and fit 8 Nergeco Roll Fast Doors and 12 insulated sectional doors in Karachi, Pakistan.

MCR Engineering recently supplied and installed a 9,000 kg capacity Double Deck Lift to DHL in Stoke-on-Trent, England.

MCR Engineering has been involved in the new Regeneron development in Limerick. PJ Hegarty has engaged MCR to Supply and fit 2 roller shutter doors, 2 ATEX roller shutter doors, 4 Nergeco Labo Rollfast Doors, 1 Nergeco Labo5 Rollfast Door and fire curtains

MCR Engineering recently supplied and installed 13 Daikin system units to Heathrow Airport for their baggage screening area. MCR Engineering also supplied ahu and fan units for the screening area.

Asgard Cleanroom Solutions recently engaged MCR Engineering to supply and fit 8 Nergeco Labo 5 doors for their client at Fort Gary, Sligo.

Constant Contact Head Seal

Constant Contact Head Seal

MCR Engineering is proud to introduce the constant contact head seal to its broad range of door and dock solutions.

Installation of the Constant Contact Head Seal has commenced at the following locations:

Installation has commenced and will be commissioned by the end of May on 18 Constant Contact Head Seals at BWG. The automated constant contact adjustable head seal ensures positive contact with roof of the vehicle is maintained during the loading /off-loading process. This product is designed to service all containerised vehicles including double deck trailers and was chosen by BWG for this reason.

Barclay Chemicals has recently completed a new warehouse facility in Damastown. Due to the corrosive nature of their products, the Constant Contact Head Seal was chosen to help eliminate the risk of environmental contamination. 4 Constant Contact Head Seals have been installed at Barclay Chemicals to date.

Trials of the Constant Contact Head Seal have recently commenced at Glanbia Ballytore and Cuisine de France.

Rapid Action Door Installation

Rapid Action Door

MCR Engineering recently installed this high grade Rapid Action Door for our client SSL Logistics, the improvements for working staff at the facility were instantaneous.

The rapid action door controls the interior of the premises from external interference with forklift remote control access.

As a result of their rapid opening and closing nature, high speed doors improve energy efficiency, hygiene, productivity and keep employees and products in a stable climate.

Esidock

Esidock installation has commenced in the following locations:

The installation of Esidock has commenced at Finnebrogue and will be completed shortly. This   facility is designed to process venison products and the client intends to supply all of the major retailers both in Ireland and the U.K from this processing plant. This is the most modern facility of its type globally and incorporates the latest technological advances in all food related building design aspects. Esidock was chosen principally for its inherent environmental sealing capabilities. The Esidock concept meets the requirement for quality products in a hygienic environment particularly in the loading dock area.

The Newcold logistics facility in Yorkshire is designed to provide a totally automated freezer warehousing/logistics centre for its clients. The Esidock is the preferred loading dock system for all of Newcold freezer facilities and a new order has been received by MCR Engineering to supply and install a further 12 Esidock systems in the Newcold logistics facility in Poland. 

MCR Engineering Service Solution

MCR Engineering have recently been appointed on a multi-year contract to service and maintain the An Post automated gates and traffic barriers across all An Post sites nationwide. This involves 24/7 reactive covers with two annual planned preventative maintenance visits.

MCR Engineering Lift Division

MCR Engineering recently installed 3* bespoke goods attendant elevators for Microsoft through John Sisk & Son in Ireland, and through MACE Contractors in Holland. These lifts are unique in their operation, combining heavy duty lifting in extreme external conditions, with attendant control installed in compliance with the Machinery Directive.

MCR Engineering has also recently installed a heavy duty goods only elevator for Structuretone on their Telecity project. This lift combines a simple high usage elevator with advanced security access tailored for specific requirements.

MCR Industrial Engineering Division

MCR Industrial Engineering recently designed and delivered bespoke stainless steel HMI mobile enclosures. The scope of this project was to provide a solution for the mounting of pharma grade HMI monitors and ancillary electrical connections. The high end monitor had to be securely retained within a stainless steel enclosure to prevent damage and to allow easy transportation within the plant. Our design team, in conjunction with the engineering department of a leading pharmaceutical manufacturing facility based in Dublin commissioned the initial scoping of the project to the final delivery. The client could not find an off the shelf solution to facilitate the requirement due to the size of the monitor being nonstandard. The application had to be completely hygienic to suit the stringent GMP environment.

Refurbishment has commenced on several spiral tablet vibration units which otherwise would have been made obsolete. MCR Engineering offered a solution to prolong the life cycle of the existing units by providing a design improvement. The nature of these units is such that the amount of vibration causes the welded joints to fracture. With the repair service that MCR Industrial Engineering are providing, the return on investment of the vibration unit will be greatly extended.

MCR Engineering Automation Division

Company: Pipelife

Project: MCR have recently completed the installation of a Fully Automatic Pipe Coil Unload and Spiral Wrapping  System. This project required a standalone unloading and packaging machine to be located beside a T231 PB hot water pipe coil unwinding machine, which will accept finished pipe coils as they are ejected from the winding spooling of the machine.

Company: WSP - Project for Pharmaceutical facility in Irvine, Scotland

Project: MCR have recently been appointed to design and install a Fully Automatic Keg Drum Transport System in a Clean Area ATEX Environment. This system has been custom designed for a Pharmaceutical company in Scotland to support their new kegging process. This is a fully automatic transport system that will bring goods in material to their product filling and processing areas. We have included specialised pressurised Pass Through Hatches to allow goods in materials to be transported from unclean zones to clean room areas in an ATEX environment.

Roll Fast Doors

MCR Engineering are pleased to introduce their range of cost effective Roll fast Doors. As we move into colder weather, allow us the opportunity to survey your site without obligation and avail of our 10% discount offer for doors ordered before end of year.

Advantages include :
· Fully automatic operation maintains swift access/exit to building
· Conforms to all EU and Statutory Health and Safety Regulations
· Maintain a controlled working environment
· Reduce heat loss from building thus reducing energy costs
· Improved employee comfort & efficiency

Esidock Installation Grifols

After an extensive consultation and design programme with PM Group, MCR Engineering/Esidock were awarded a major contract with Stewart for Grifols at their new European storage and logistics hub. MCR Engineering are currently supplying and installing 7 Esidock systems, including vehicle restraints and wheel aligners. What is an Esidock? Visit www.esidock.com to find out more.

MCR Engineering Installation at Rottapharm

MCR Engineering have recently completed a project for Rottapharm in their Dublin manufacturing facility that consisted of the Supply and fit of 14 specialist Clean Room DoorSets,14 Automated Clean Room Roll fast doors, and the supply and installation of a 4000 kg capacity Hidral Goods Lift.

MCR Engineering Installation at numerous other projects recently

MCR Engineering have recently been working with Ardmac on their project for Tech Group in West Dublin supplying and fitting 11 Automated Clean Room Roll fast doors,  2 specialist loading dock systems, and a 1000 kg capacity Hidral Goods Lift.

MCR Engineering were recently commissioned by John Sisk & Sons to Supply and fit 2 * 2000kg capacity with 8m travel Goods lifts with attendant at the Microsoft HQ in Dublin. MCR are also engaged in similar projects for Microsoftin Holland.

MCR Engineering have recently completed the design, supply and installation of a large Pallet Handling System for PM Group for their client GSK at their site in Currabinny.

MCR Engineering have recently completed the secondary steel package for John Sisk & Sons on Dun Laoghaire Library. This consisted of all secondary steel, architectural steel and glazed cladding.

MCR Engineering have recently undertaken the secondary steel package for JJ Rhatigans at St Patricks College in Drumcondra - This consisted of all secondary steel, glass balustrades and architectural metalwork.

 

24 Hour Service

MCR clients can enjoy the assurance of full 24 hour service coverage. Our 24 Hour Service Support Line staff are always available at: +353 1 88 99 170